Every generated entry copied each Job Card Item's full required_qty in
the skip-transfer and BOM-backflush paths, so two entries for one job
card consumed the requirement twice. Scale the rows to the share of
production this entry accounts for and cap them at the requirement
still unconsumed, dropping rows that have nothing left. An entry whose
materials are exhausted then fails the existing at-least-one-raw-material
check instead of minting finished goods from nothing.
Saving a submitted manufacture entry to change an allowed field re-ran
the pending production cap with a manufactured aggregate that already
includes the entry itself, so the save was rejected against the
post-entry remainder. Quantities are not editable after submit, so the
check has nothing to protect there.
The WIP warehouse change also removed the Target Warehouse exemption
for semi FG orders, but those may validly carry the target on each
operation instead. Restore the exemption in the form and the submit
check; the WIP warehouse requirement stays.
After a partial entry booked the job card's full process loss, the
next generated entry was sized qty-to-produce minus manufactured only.
It exceeded the pending production cap, so Make Stock Entry could not
finish the card. Subtract the consumed loss when sizing the entry.
Entries from operations without their own BOM carry no For Quantity,
so the finished-good reconciliation cannot run for them and a draft
created before other entries were submitted could still over-produce.
Validate every job-card manufacture entry against the job card
directly: finished goods plus process loss must fit in what the job
card still has left to produce after earlier submitted entries.
The finished_good derivation ran in validate_semi_finished_goods,
after set_materials_based_on_operation_bom had already expanded
operation BOM materials. A single-pass insert-and-submit (API or
import) with bom_no set but finished_good empty skipped the expansion,
persisting a submitted BOM without the referenced components. The
derivation also let a final operation inherit another item from its
bom_no, so downstream job cards would produce the wrong item.
Move the derivation into set_operation_finished_goods, called before
the expansion, prefer the BOM's own item for the final operation, and
reject a final operation whose FG item is not the BOM's item.
get_item_details returns the whole Item document, so the dialog row's
name became the item code. get_item_data then matched that item code
against every Components row regardless of operation, so adding an item
already used by another operation silently updated that row's qty
instead of appending one for the target operation — which stayed empty
and failed 'please add raw materials or set a BOM' on submit.
Match the existing row by item code within the same operation: same
operation updates the qty, any other match appends a new row.
set_process_loss_qty stamped MAX(process_loss_qty) across every
operation of the work order onto each manufacture entry. With semi
finished goods tracking, one operation's process loss leaked into the
entries of every other operation: validate_fg_completed_qty then
rejected the entry when it had a BOM, or the wrong loss was recorded
silently when it did not, double-counting the loss across operations.
When the entry belongs to a job card, use that job card's loss net of
what its earlier entries already booked. The MAX fallback stays for
work-order level entries without a job card.
Fixesfrappe/erpnext#57892
When a previous operation manufactured less than the current job card
is completing, the error always said 'Submit the manufacturing entry
for the operation first' — even when the entry was already submitted
and the missing quantity was booked as process loss, which made the
advice a dead end.
Sum the process loss of the previous operation's job cards alongside
the manufactured quantity. When manufactured + process loss covers the
requested quantity, say the shortfall is process loss so the user
knows to reduce the completed quantity; keep the submit-first message
for genuinely pending manufacturing entries.
Work orders with track_semi_finished_goods were exempt from the
Work-in-Progress Warehouse requirement in three places: the field's
mandatory_depends_on, the fg_warehouse reqd toggle in the form script,
and validate_warehouse on submit.
The exemption was misleading. The flow still transfers materials to a
WIP warehouse when 'Skip Material Transfer' is unchecked: operations
default their WIP warehouse from the work order, and
set_default_warehouse silently restores the company default after the
user clears the field. Make the field genuinely required instead of
pretending it is optional.
validate_transfer_qty uses an empty finished_good to detect legacy job
cards, and unlike validate_semi_finished_goods it ignores
skip_material_transfer. A job card tracking semi finished goods whose
operation had no finished_good fell into the legacy branch and could
not be submitted even with 'Skip Material Transfer' checked on the
work order.
Return early for semi FG job cards; validate_semi_finished_goods
already enforces the transfer requirement for them and honours
skip_material_transfer.
A BOM with track_semi_finished_goods enabled could be saved with no
finished_good on any operation: validate_semi_finished_goods only
checked that one row had 'Is Final Finished Good' set, and a list
containing None passed the emptiness check.
Such a BOM breaks every downstream step. The work order copies the
empty finished_good into its operations, job cards inherit it, and
Make Stock Entry finally fails with 'Item None not found' because the
manufacture entry has no production item.
Derive the finished good where it is unambiguous: an operation that
references a BOM produces that BOM's item, and the final operation
produces the BOM's own item. Otherwise require it on the row, since
each operation's job card books its output through it.
cint truncates, so a stock_qty of 1999.9998 (dust from qty times
conversion factor) compared as abs(1999 - 2000.0) > epsilon and was
rejected as fractional even though it rounds to a whole number at
field precision, with the error confusingly printing the rounded
value: 'Quantity (2000.0) cannot be a fraction'. Round to field
precision first, then require the result to be a whole number.
Dust above an integer already passed; this fixes the asymmetry for
dust below.
stock_qty is stored as raw qty * conversion_factor, so a UOM-converted
order for exactly the minimum (e.g. LB to Kg) produces values like
1999.999999131832 vs a min_order_qty of 2000 and blocks the Purchase
Order. Round both sides to the stock_qty field precision before
comparing, and show the rounded qty in the error message.
Pick List, Material Request, Material Consumption and Additional
Material Transfer were spread across two standalone buttons and a
separate Make menu. Put them all under a single Create menu, and rename
Create Pick List to Pick List since the menu already says Create.
custom_make_buttons is updated to the new label so the connections
shortcut still finds the button.
Covers the _add_remaining_purchase_request path: partial stock in
another warehouse is allocated as a transfer and the residual purchase
qty goes through the second rounding site.
The stock-UOM qty is rounded in _accumulate_so_items, but the purchase
UOM conversion divided it by the conversion factor without re-rounding,
storing values like 5738748.300863984 in mr_items.quantity. The raw
value flowed into Material Request qty and the raw materials CSV, and
make_material_request compares quantity to requested_qty with exact
float equality, so any rounding downstream left dust quantities.
The division by conversion_factor in _adjust_required_qty_for_uom sits
directly after frappe.throw inside the same block, so it can never run.
It has been dead since commit 2a8cd05b44 (#27278) re-indented it into
the throw branch; the actual purchase-UOM conversion happens in
_material_request_item_row via _mr_purchase_conversion_factor.
* feat(accounts): split exchange gain and exchange loss accounts
Add optional Exchange Gain Account and Exchange Loss Account fields on
Company. When set, realized FX gain/loss from settling an invoice in a
foreign currency (via Payment Entry, Payment Reconciliation, or a
Journal-Entry-based advance) books to the matching account instead of
the single Exchange Gain/Loss account. Either field left blank falls
back to the existing Exchange Gain/Loss account, so companies that
don't configure the new fields are unaffected.
New companies get "Exchange Gain" and "Exchange Loss" accounts
auto-created in their chart of accounts and auto-assigned to the new
fields, same as the existing Exchange Gain/Loss account provisioning.
The Payment Reconciliation tool's per-allocation "Difference Account"
override in its reconcile dialog continues to work as before; the
split accounts only change the computed default shown there.
* test(account_balance): account for new Exchange Gain account in income report
The new auto-provisioned Exchange Gain account under Indirect Income
now shows up in the Income root type report for _Test Company 2.
---------
Co-authored-by: test <test@test.com>
* fix: use current batch avg rate for outward returns of batchwise valuation batches
* fix: honor zero batch average and avoid duplicate batch classification query