Merge pull request #20556 from ashish-greycube/patch-3

fix: backflush raw material based on - Material Transferred for Manufacture
This commit is contained in:
rohitwaghchaure
2020-02-11 19:50:09 +05:30
committed by GitHub

View File

@@ -1056,7 +1056,7 @@ class StockEntry(StockController):
req_qty_each = flt(req_qty / manufacturing_qty)
consumed_qty = flt(req_items[0].consumed_qty)
if trans_qty and manufacturing_qty >= (produced_qty + flt(self.fg_completed_qty)):
if trans_qty and manufacturing_qty > (produced_qty + flt(self.fg_completed_qty)):
if qty >= req_qty:
qty = (req_qty/trans_qty) * flt(self.fg_completed_qty)
else: