Files
erpnext/erpnext/manufacturing
mergify[bot] d15b7ca9af fix: fix sub assembly qty calculation in production plan when bom level >= 1 (backport #47296) (#47315)
* fix: fix sub assembly qty calculation in production plan when bom level >= 1

(cherry picked from commit bfc4ce1d5d)

* fix: logical error

(cherry picked from commit ee10afc074)

---------

Co-authored-by: Mihir Kandoi <kandoimihir@gmail.com>
2025-04-29 18:12:36 +05:30
..
2013-12-11 10:43:52 +05:30

Plan and manage manufacturing operations, bill of materials for manufacturing.