Mihir Kandoi 3bd3354152 fix(job_card): require the previous operation to be manufactured (#57684)
* fix(job_card): block next operation until previous operation is manufactured

With track semi finished goods, Work Order Operation completed_qty is set from
the submitted job cards' total completed qty, so a job card of the next
operation could be started and completed even when no Manufacture entry existed
for the previous operation. The semi-finished goods it consumes were never
produced.

Validate the sequence against the qty actually manufactured against the previous
operations' job cards (Manufacture entries / Subcontracting Receipts) when the
work order tracks semi finished goods.

* test(job_card): cover manufactured qty check across previous operations

Work order with operations A and B at sequence 1 and C at sequence 2, tracking
semi finished goods. C stays blocked while A's job card is submitted but its
Manufacture entry is missing, and once A is manufactured for 3, C can only be
completed for 3.