diff --git a/erpnext/manufacturing/doctype/manufacturing_settings/manufacturing_settings.json b/erpnext/manufacturing/doctype/manufacturing_settings/manufacturing_settings.json index 0797f53278f..570ae6637ee 100644 --- a/erpnext/manufacturing/doctype/manufacturing_settings/manufacturing_settings.json +++ b/erpnext/manufacturing/doctype/manufacturing_settings/manufacturing_settings.json @@ -201,9 +201,6 @@ "description": "In the case of 'Use Multi-Level BOM' in a work order, if the user wishes to add sub-assembly costs to Finished Goods items without using a job card as well the scrap items, then this option needs to be enable.", "fieldname": "set_op_cost_and_scrape_from_sub_assemblies", "fieldtype": "Check", -<<<<<<< HEAD - "label": "Set Operating Cost / Scrape Items From Sub-assemblies" -======= "label": "Set Operating Cost / Scrap Items From Sub-assemblies" }, { @@ -240,18 +237,13 @@ "fieldname": "validate_components_quantities_per_bom", "fieldtype": "Check", "label": "Validate Components and Quantities Per BOM" ->>>>>>> a9b761f862 (fix: typo in manufacturing settings) } ], "icon": "icon-wrench", "index_web_pages_for_search": 1, "issingle": 1, "links": [], -<<<<<<< HEAD - "modified": "2023-12-28 16:37:44.874096", -======= "modified": "2025-01-09 16:02:23.326763", ->>>>>>> a9b761f862 (fix: typo in manufacturing settings) "modified_by": "Administrator", "module": "Manufacturing", "name": "Manufacturing Settings", @@ -269,4 +261,4 @@ "sort_order": "DESC", "states": [], "track_changes": 1 -} \ No newline at end of file +}